VIC General: Beach Road, - Road Construction Works - Lanes closed both directions (4117776), Road Construction Works activities occurring between 13/02/2020 and 30/06/2020 during the following times: Weekdays 9:30 AM to 3:00 PM Altered speed limit during operation will be 40 and the traffic delay is expected to be 0 to 5 min

Orlando Street, Hampton