VIC General: Baxter-Tooradin Road (C781), - Road Construction Works - Lanes closed both directions (3759653), Road Construction Works activities occurring between 23/07/2019 and 31/10/2019 during the following times: Weekdays 9:30 AM to 3:30 PM Note that changed conditions may also be in place during 3:30 PM to 9:30 AM
Altered speed limit during operation will be 40 and the traffic delay is expected to be 0 to 5 min

Hann Street, Pearcedale